Hausvik port, Lyngdal

Hausvik will have 600–700 meters of deep-water quay front with depths down to 15–20 meters.

200,000m2 of land is available for the offshore wind industry, and there is an option for regulating even 300,000m2 more.

Hausvik is close to open seas, making the area ideal for assembling offshore wind turbines.

The port is located in a non-tidal area.

Port data

The port is due to be expanded and the new area is expected to be available from 2026.

Yard size up to

500,000m2

Future deep-water quay front

600-700m

The port strategy is to be an assembling site for offshore wind. New quay front will enable two boats to load at the same time.